Wet blown-in cellulose wall insulation installation on our new net zero energy construction project in the Oakland hills!!
Video on the initial installation process:
It’s 2×6 framing (so you can fit a lot in the walls), has a high R value per inch, makes perfect contact with the drywall, is long lasting and resistant to settling.
After blowing it into the open stud bays, a device is used to shave the insulation to plumb with the studs:
Your working video content is really nice, i enoyed the whole footage. That seems really informative content, i loved it